Projects

Amelia Cutoff – Ditch 100-E
FEMA Project
Linear Detention Basin

East China Relief – Ditch 600
FEMA FMA Program administered by TWDB
Channel improvements and a detention basin are being constructed to improve the conveyance of the system and to add storage volume.

Sarah Street – Ditch 107
A detention basin is being constructed in the south end of Beaumont at the confluences of ditches 107-A and 107-A2. This basin will add storage capacity to the system during heavy rain events.

South Nome Relief – Ditch 804-D
FEMA Grant administered by TDEM (HMGP)
A combination of channel improvements and LNVA crossing improvements are being utilized to improve drainage within south Nome and redirect water from Hwy 365 to a 53-acre detention basin that will reduce flows downstream.