Maintenance Projects
Maintenance projects are minor projects aimed at returning channels and other stormwater infrastructure to its designed condition by:
- Repairing slope failures, cavities, downspouts, water control structures, and other damage caused by erosion
- Removing sediment that can reduce stormwater conveyance capacity
- Removing trees and vegetation that restrict the flow of stormwater
- Constructing new channel crossings or upsizing existing crossings
Maintenance projects are often performed by District staff.
Projects for Consideration |
Ditch 401-A Ridgecrest Enhancements |
Projects in Design Phase |
Cheek Area Outfall |
Ditch 403-A1 – Haddad LNVA Crossing |
Ditch 403-A1A Dairy Ridge Outfall |
Ditch 500-XA Enhancements |
Ditch 550 Needmore Stockpile Removal @ Willow Slough |
Ditch 600 Channel Improvement |
Ditch 605-E1 Mallot Road & LNVA |
Lawhon Detention Ditch to Boyt Rd. (Villarreal) |
Lovell Lake Study |
Needmore Dredge Strategy |
Needmore Enhancements |
Projects in Construction Phase |
Brentwood / Amelia Cutoff Slope Failures |
Ditch 110 Railroad Bridge |
Willow Slough Flap Gates-Sabine Ranch |
Completed Projects |
Date Completed |
Jim Broussard Ditch | March 2020 |
Ditch 511 DD6 Access Crossing at Texas Third Resource | April 2020 |
Ditch 607 Ditch Enhancements | May 2020 |
Ditch 709 Canal Crossing from West Hamshire Road | June 2020 |
Ditch 8003 Flap Gates | June 2020 |
Coral Creek Outfall | July 2020 |
Daisy Drive Outfall | July 2020 |
Ditch 118-B Ditch Enhancements at the End of Afton Lane | July 2020 |
Ditch 500-A3, 500-A4 & 500-A4A Enhancements | August 2020 |