Maintenance Projects
Maintenance projects are minor projects aimed at returning channels and other stormwater infrastructure to its designed condition by:
- Repairing slope failures, cavities, downspouts, water control structures, and other damage caused by erosion
- Removing sediment that can reduce stormwater conveyance capacity
- Removing trees and vegetation that restrict the flow of stormwater
- Constructing new channel crossings or upsizing existing crossings
Maintenance projects are often performed by District staff.
Projects for Consideration |
| Ditch 401-A Ridgecrest Enhancements |
Projects in Design Phase |
| Cheek Area Outfall |
| Ditch 403-A1 – Haddad LNVA Crossing |
| Ditch 403-A1A Dairy Ridge Outfall |
| Ditch 500-XA Enhancements |
| Ditch 550 Needmore Stockpile Removal @ Willow Slough |
| Ditch 600 Channel Improvement |
| Ditch 605-E1 Mallot Road & LNVA |
| Lawhon Detention Ditch to Boyt Rd. (Villarreal) |
| Lovell Lake Study |
| Needmore Dredge Strategy |
| Needmore Enhancements |
Projects in Construction Phase |
| Brentwood / Amelia Cutoff Slope Failures |
| Ditch 110 Railroad Bridge |
| Willow Slough Flap Gates-Sabine Ranch |
Completed Projects |
Date Completed |
| Jim Broussard Ditch | March 2020 |
| Ditch 511 DD6 Access Crossing at Texas Third Resource | April 2020 |
| Ditch 607 Ditch Enhancements | May 2020 |
| Ditch 709 Canal Crossing from West Hamshire Road | June 2020 |
| Ditch 8003 Flap Gates | June 2020 |
| Coral Creek Outfall | July 2020 |
| Daisy Drive Outfall | July 2020 |
| Ditch 118-B Ditch Enhancements at the End of Afton Lane | July 2020 |
| Ditch 500-A3, 500-A4 & 500-A4A Enhancements | August 2020 |